Challenge
Our client is one of the leading profile manufacturing companies who faced problems with the changeover of the profile rolling machine. It became evident that the client was experiencing significant difficulties during changeovers, primarily due to inadequate execution by operators. They were struggling to perform a single changeover which was taking as long as 8 hours to complete. The absence of standardized changeover procedures contributed to the inefficiencies.
Solutions
Cusmat's VR based Vaccum Pump Hands on Simulator
Cusmat's VR based Vaccum Pump Hands on Simulator
Cusmat's VR-based Crimping Process Hands On Simulator